As experts in home standby power, CT Generator Service and L-Train Electric are the best for quick Generation Installation, professionally, and are cost effective.

STEP 1: Choose a Location

  • A home consultation will help you pick a location for the generator.

The location should meet these Guidelines:

  • Stable, well-drained area that will not flood
  • Room around the generator for the technician and maintenance personnel.
  • Keep in mind homeowners association and community restrictions when choosing a site.

Approximate Clearances to keep in mind:

  • 18 inches (1.5 feet) from the house
  • 60 inches (5 feet) from doors, windows, and fresh air intakes
  • 36 inches (3 feet) in front of the generator for servicing room

The closer the site is to a natural gas line and the electric meter, the more you will save on installation costs.

STEP 2: Installation

  • Prepare the site with a concrete slab or pea gravel
  • Place generator on the concrete slab/ gravel

STEP 3: Connecting Fuel and Electrical

  • Fuel line is connected
  • Transfer switch installed next to the main breaker box
    • The transfer switch senses where the power is coming from and when to switch over to generator power.

STEP 4: Outage Simulation

  • Technician checks that everything works as it also should
  • Set up weekly self-test to ensure everything continues to function as normal

Contact Us When Your for Your Generator Installation and Also for Maintenance!

☎️ (860) 343-1797
📩 customerservice@ctgeneratorservice.com

Related Articles: